Latest updated: Jan 27, 2024 Video recording version: 8.0.0.516, compatible with BTS 8.0 software.
Today, we will demonstrate on how to adjust the size and position of the device list.
Open the BTS software.
On the left side is the device list. You can directly resize the device list to make it smaller. You can also drag the device list to position it anywhere you want on the screen.
If you wish to restore the default state of the device list, simply double-click on it.
That wraps up the entire demonstration. Thanks for watching.
This operation video tutorial is applicable to the following products: ● CT-4000 Battery Testing System Series (CT-4008Q-5V100mA, CT-4008Q-5V6A-S1, CT-4008Q-5V6A-164, CT-4008Q-5V12A-S1, CT-4008Q-5V12A-164, etc.) ● CE-6000 Battery Testing System Series (Cell, Module, Pack, etc.) ● CT/CTE-8000 Battery Testing System Series (CT-8002Q-5V100mA, CTE-8008-5V200A, etc.) ● All-in-One Battery Testing System Series (WHW-25L-S-16CH, WIHW-200-160CH-B, WHW-100L-2-160CH, WHW-500L-5V6A80CH-380V, WGDW-380L-2-40BFC-5V600A8CH, etc.)