Latest updated: Dec 25, 2023 Video recording version: 8.0.0.483, BTS 8.0
Today we will demonstrate how to cancel parallelization.
First, open the BTS8.0 software.
Select the parallel channel in the channel interface.
Right click and select "Free parallel".
That is all about this topic.Thanks for watching!
This operation video tutorial is applicable to the following products: ● CT-4000 Battery Testing System Series (CT-4008Q-5V100mA, CT-4008Q-5V6A-S1, CT-4008Q-5V6A-164, CT-4008Q-5V12A-S1, CT-4008Q-5V12A-164, etc.) ● CE-6000 Battery Testing System Series (Cell, Module, Pack, etc.) ● CT/CTE-8000 Battery Testing System Series (CT-8002Q-5V100mA, CTE-8008-5V200A, etc.) ● All-in-One Battery Testing System Series (WHW-25L-S-16CH, WIHW-200-160CH-B, WHW-100L-2-160CH, WHW-500L-5V6A80CH-380V, WGDW-380L-2-40BFC-5V600A8CH, etc.)