How to display completion time of Channels in the Main Interface

Latest updated: Dec 15, 2023
Video recording version: 8.0.0.483, compatible with BTS 8.0 software.

Today, we will demonstrate how to display the completion time of a test for channels on the main interface.


  • Open the BTS software. Click on the "Display settings" option located in the bottom right corner.

  • Check the box next to "End time" to enable this feature. Once enabled, you will be able to see the completion time of each channel in the testing position within the interface.

  • Channels that display a time of 0 indicate that they have not been run or tested yet.


That wraps up the entire demonstration. Thanks for watching.

This operation video tutorial is applicable to the following products:
● CT-4000 Battery Testing System Series (CT-4008Q-5V100mA, CT-4008Q-5V6A-S1, CT-4008Q-5V6A-164, CT-4008Q-5V12A-S1, CT-4008Q-5V12A-164, etc.)
● CE-6000 Battery Testing System Series (Cell, Module, Pack, etc.)
● CT/CTE-8000 Battery Testing System Series (CT-8002Q-5V100mA, CTE-8008-5V200A, etc.)
● All-in-One Battery Testing System Series (WHW-25L-S-16CH, WIHW-200-160CH-B, WHW-100L-2-160CH, WHW-500L-5V6A80CH-380V, WGDW-380L-2-40BFC-5V600A8CH, etc.)



· Battery Exhibitions

NEWARE and Cookies
We use Cookie to personalize and improve your experience with our website. By continuing to browse the site you are agreeing to our use of cookies.