How to insert a new work step between two rows of work steps
Latest updated: Dec 25, 2023 Video recording version: 8.0.0.483, BTS 8.0
Today we will demonstrate how to insert a new work step between two lines of work steps.
First, open the BTS 8.0 software.
Right-click on a channel and select "Single start(s)".
Select a line of work step, right-click and select "Insert".
You can insert a new line under this step and set the parameters.
That is all about this topic.Thanks for watching!
This operation video tutorial is applicable to the following products: ● CT-4000 Battery Testing System Series (CT-4008Q-5V100mA, CT-4008Q-5V6A-S1, CT-4008Q-5V6A-164, CT-4008Q-5V12A-S1, CT-4008Q-5V12A-164, etc.) ● CE-6000 Battery Testing System Series (Cell, Module, Pack, etc.) ● CT/CTE-8000 Battery Testing System Series (CT-8002Q-5V100mA, CTE-8008-5V200A, etc.) ● All-in-One Battery Testing System Series (WHW-25L-S-16CH, WIHW-200-160CH-B, WHW-100L-2-160CH, WHW-500L-5V6A80CH-380V, WGDW-380L-2-40BFC-5V600A8CH, etc.)