How to move a channel that is currently being tested
Latest updated: Dec 07, 2023 Video recording version: 8.0.0.483, compatible with BTS 8.0 software.
Today, we will demonstrate how to move a running channel.
To migrate a running channel to another testing channel, simply hold down the "Ctrl" and select both the currently active channel and the channel you want to migrate.
Right-click and choose "Move" to complete the migration.
That wraps up the entire demonstration. Thanks for watching!
This operation video tutorial is applicable to the following products: ● CT-4000 Battery Testing System Series (CT-4008Q-5V100mA, CT-4008Q-5V6A-S1, CT-4008Q-5V6A-164, CT-4008Q-5V12A-S1, CT-4008Q-5V12A-164, etc.) ● CE-6000 Battery Testing System Series (Cell, Module, Pack, etc.) ● CT/CTE-8000 Battery Testing System Series (CT-8002Q-5V100mA, CTE-8008-5V200A, etc.) ● All-in-One Battery Testing System Series (WHW-25L-S-16CH, WIHW-200-160CH-B, WHW-100L-2-160CH, WHW-500L-5V6A80CH-380V, WGDW-380L-2-40BFC-5V600A8CH, etc.)