Today we demonstrate how to set up the chamber binding.
First, open the BTS 8.0 software.
Right-click on the channel and select "Set chamber".
You need to set the "Temperature chamber" and "Layer number".
The temperature chamber number can be filled in according to the actual situation.
Layer number refers to a chamber where we can control the temperature individually.
Click "OK".
That is all about this topic.Thanks for watching!
This operation video tutorial is applicable to the following products: ● CT-4000 Battery Testing System Series (CT-4008Q-5V100mA, CT-4008Q-5V6A-S1, CT-4008Q-5V6A-164, CT-4008Q-5V12A-S1, CT-4008Q-5V12A-164, etc.) ● CE-6000 Battery Testing System Series (Cell, Module, Pack, etc.) ● CT/CTE-8000 Battery Testing System Series (CT-8002Q-5V100mA, CTE-8008-5V200A, etc.) ● All-in-One Battery Testing System Series (WHW-25L-S-16CH, WIHW-200-160CH-B, WHW-100L-2-160CH, WHW-500L-5V6A80CH-380V, WGDW-380L-2-40BFC-5V600A8CH, etc.)