Setting and modification of mandatory conditions for work step parameters
Latest updated: Dec 25, 2023 Video recording version: 8.0.0.483, BTS 8.0
Today we will demonstrate the setting and modification of mandatory conditions for step parameters.
First, open the BTS8.0 software.
Click "Set", enter "System settings".
Click "Step edit", find "Step parameters must be set up".
Select the desired step to be set up,click "Save".
That is all about this topic.Thanks for watching!
This operation video tutorial is applicable to the following products: ● CT-4000 Battery Testing System Series (CT-4008Q-5V100mA, CT-4008Q-5V6A-S1, CT-4008Q-5V6A-164, CT-4008Q-5V12A-S1, CT-4008Q-5V12A-164, etc.) ● CE-6000 Battery Testing System Series (Cell, Module, Pack, etc.) ● CT/CTE-8000 Battery Testing System Series (CT-8002Q-5V100mA, CTE-8008-5V200A, etc.) ● All-in-One Battery Testing System Series (WHW-25L-S-16CH, WIHW-200-160CH-B, WHW-100L-2-160CH, WHW-500L-5V6A80CH-380V, WGDW-380L-2-40BFC-5V600A8CH, etc.)