FAQ is designed to assist users in swiftly resolving issues encountered during software installation, device usage, and testing processes. They ensure adherence to correct procedures, thus providing the most accurate measurement results possible.
Scenario Description: When performing a rate test with the BTS software, data may be superimposed on two adjacent loops of a rate transition.
For example, when cycling 10 cycles at 10C and 20C respectively, the data of the 10th cycle is superimposed with the data of the 11th cycle. This can be solved by modifying the loop statistics.
Open the BTSDA software, right click on the data area and select "Cycle statistics/calculation". It is recommended to change it to "Charge first" or "Discharge first", then click OK.