Hardware
Software
Battery Manufacturing Terminology
Detailed data of the test, including recording serial number, time, voltage, current, capacity, energy, specific capacity, absolute time, etc.
A test profile which is consisted of one/ multiple steps.
The unassigned auxiliary channels are allocated to the main channel in average.
Modify channel's test steps which is under running.
Summary data of work step, including work step number, work step mode, work step time, work step capacity, etc.
Follow the external signal value to charge and discharge(for example singal from BMS).
One set of work step processes as a work step in another set of work step processes (mainly used for work step reuse).
The control step is not a routine charge / discharge step, but internal / external operations, such as waiting, vacuumizing, etc.
During the battery charging and discharging process, the electric energy released by the battery discharge is recovered and supplied to the adjacent channel or other nearby test instruments for use
A single test procedure of a test profile
The cathode/anode material, which attends the current formation reaction (electrochemical reaction process).
Take C-rate as the Cut-off condition for the work steps.
Cut-off conditions of the running work steps