Hardware
Software
Battery Manufacturing Terminology
Restart the test with the steps of the last test, and combine the data of the two tests together.
Manually stop the selected channel.
Load the barcode file and start all the channels under one control unit or in one cabinet.
Under the production line mode, start the all channels of one layer by pressing at one time.
Stop all channels under under one control unit or in one cabinet.
Set the pause condition in advance, and stop the test when the operation of the step meets the condition.
Set the selected channels in parallel mode.
Release parallelled channels.
Conditions for data recording.
According to certain conditions, the recording conditions are set separately.
The capacity of the same step will be accumulated.
The software/system saves the tested data into a specified directory automatically according to the set conditions.
The discharge capacity of a certain cycle is set as the standard, and the decay rate is obtained by comparing each subsequent cycle with the standard cycle.
Copy the steps of one channel to other channels.
The details of the selected channel.
The resistance of the battery itself.